A: Typically, a water barrier is installed, then metal furring (z–bar or hat bar) is fixed to the existing outside building walls. The metal wall cladding is then affixed to the furring, whose depth is determined by the building specifications.
A: Typically, a water barrier is installed, then metal furring (z–bar or hat bar) is fixed to the existing outside building walls. The metal wall cladding is then affixed to the furring, whose depth is determined by the building specifications.